NAICS 2022 236 to Construction Project Delivery Method Types
Crosswalk mapping from NAICS 2022 236 "Construction of Buildings" to Construction Project Delivery Method Types. 5 official equivalences.
NAICS 2022 236 in Construction Project Delivery Method Types
Each entry is an official equivalence edge. Click to see the full Construction Project Delivery Method Types definition, hierarchy, and its own crosswalks.
- dcpd_altbroadSpecialty and Alternative Delivery Methods
derived:sector_anchor:v1
- dcpd_cmbroadConstruction Management Models
derived:sector_anchor:v1
- dcpd_dbbroadDesign-Build (DB) and Integrated Delivery
derived:sector_anchor:v1
- dcpd_dbbbroadTraditional Design-Bid-Build (DBB)
derived:sector_anchor:v1
- dcpd_p3broadPublic-Private Partnership (P3)
derived:sector_anchor:v1
About NAICS 2022 236
236 Construction of BuildingsThe Construction of Buildings subsector comprises establishments primarily responsible for the construction of buildings. The work performed may include new work, additions, alterations, or maintenance and repairs. The on-site assembly of precut, panelized, and prefabricated buildings and construction of temporary buildings are included in this subsector. Part or all of the production work for which the establishments in this subsector have responsibility may be subcontracted to other construction establishments--usually specialty trade contractors. Establishments in this subsector are classified based on the types of buildings they construct. This classification reflects variations in the requirements of the underlying production processes.